
The long-term durability of a concrete sidewalk depends entirely on the stability of the foundation directly beneath the pour. Our field crews execute intensive site preparation, utilizing specialized machinery to excavate down below the organic topsoil layer to clear away loose dirt, aggressive weed networks, and roots. We replace this material with a thick, uniform course of engineered crushed stone aggregate road base and perform multi-pass mechanical compaction using industrial vibratory plate compactors to build an unyielding load-bearing foundation that prevents future settling or listing.


Hours:
Monday: 4:00 AM - 11:00 PM
Tuesday: 4:00 AM - 11:00 PM
Wednesday: 4:00 AM - 11:00 PM
Thursday: 4:00 AM - 11:00 PM
Friday: 4:00 AM - 11:00 PM
Saturday: 4:00 AM - 11:00 PM
Sunday: 4:00 AM - 11:00 PM
Copyright 2026. Gen Concrete Contractors Austin All Rights Reserved.